User Tools

Site Tools


transnational_access:transnational_access:research_visits

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

transnational_access:transnational_access:research_visits [2026/02/13 09:56] – created finconstransnational_access:transnational_access:research_visits [2026/02/13 10:06] (current) fincons
Line 1: Line 1:
-==== Management of Research Visits ====+====== Visit Management ======
  
-=== Overview of Research Visits ===+===== Overview of Research Visits =====
  
 The research visit represents the operational phase of the Transnational Access programme and takes place after the acceptance of a Research Proposal. The research visit represents the operational phase of the Transnational Access programme and takes place after the acceptance of a Research Proposal.
  
-Through the WP11 TNA platform, visits are planned, monitored, and completed according to a structured lifecycle that ensures traceability and control of all activities performed.+Through the WP11 TNA platform, visits are planned, monitored, and completed according to a structured lifecycle that ensures traceability and control of the activities performed.
  
-The management of visits primarily involves the Host Coordinator and the Fellow, each acting within their respective responsibilities.+Visit management primarily involves the Host Coordinator and the Fellow, each acting according to their respective responsibilities.
  
-=== Creation of the Visit ===+----
  
-A visit is automatically generated following the acceptance of a Research Proposal.+===== Creation of the Visit ===== 
 + 
 +A visit is generated following the acceptance of a Research Proposal.
  
 At the time of creation: At the time of creation:
  
-  * the visit is automatically set to the status ''Draft''+  * the visit is automatically set to the Draft status
-  * the main information from the accepted proposal is linked to the visit;+  * the main information of the accepted proposal is associated with the visit;
   * the visit becomes visible to the involved actors.   * the visit becomes visible to the involved actors.
  
-The ''Draft'' status allows completion and verification of the necessary details before final planning.+The Draft status allows completion and verification of the required details before final planning.
  
-=== Planning of the Visit ===+----
  
-The planning of the visit is the responsibility of the Host Coordinator.+===== Planning of the Visit ===== 
 + 
 +Planning the visit is the responsibility of the Host Coordinator.
  
 During this phase, the Host Coordinator may: During this phase, the Host Coordinator may:
  
   * define the visit period;   * define the visit period;
-  * confirm the availability of the hosting facilities; +  * confirm the availability of hosting facilities; 
-  * update the operational information required for the visit.+  * update the operational information necessary for the execution of the visit.
  
-Once planning is completed, the visit changes to the status ''Planned''.+Once planning is completed, the visit transitions to the Planned status.
  
-=== Execution of the Visit ===+----
  
-During the execution phase:+===== Execution of the Visit ===== 
 + 
 +During the visit:
  
   * the Fellow carries out the planned research activities;   * the Fellow carries out the planned research activities;
-  * the Host Coordinator provides institutional support at the hosting organisation+  * the Host Coordinator provides the necessary institutional support; 
-  * visit information remains accessible but is no longer editable.+  * visit information remains available for consultation but is no longer editable.
  
-The platform allows monitoring of the visit status in accordance with the defined workflow.+The platform allows monitoring of the visit status in alignment with the defined process.
  
-=== Completion of the Visit ===+----
  
-At the end of the research activities, the Host Coordinator updates the visit status by selecting the action ''Finish''.+===== Completion of the Visit =====
  
-With this action:+At the end of the research activities, the Host Coordinator selects the Finish action.
  
-  * the visit changes to the status ''Finished''+As a result: 
-  * the operational phase of the visit is considered concluded; + 
-  * it becomes possible to proceed with reporting and documentation activities.+  * the visit transitions to the Finished status
 +  * the operational phase of the visit is formally concluded; 
 +  * post-visit reporting activities may proceed.
  
 A completed visit is no longer editable. A completed visit is no longer editable.
  
-=== Cancellation of the Visit ===+----
  
-If the Fellow is unable to carry out the visit or if conditions prevent its execution, the Host Coordinator may cancel the visit.+===== Cancellation of the Visit ===== 
 + 
 +If the Fellow is unable to carry out the visit or circumstances prevent its execution, the Host Coordinator may cancel the visit.
  
 In case of cancellation: In case of cancellation:
  
-  * the visit changes to the status ''Cancelled'';+  * the visit transitions to the Cancelled status;
   * the visit does not proceed to completion;   * the visit does not proceed to completion;
-  * the cancellation is recorded by the system for traceability purposes.+  * all involved actors are informed through notification. 
 + 
 +The cancellation is recorded by the system for historical traceability and audit purposes. 
 + 
 +---- 
 + 
 +===== Operational Restrictions and Permissions =====
  
-=== Operational Restrictions and Permissions ===+The actions allowed on a visit depend on its current status:
  
-The actions available for visit depend on its current status:+  * in the Draft status, the visit can be modified; 
 +  * in the Planned status, information is available for consultation; 
 +  * in the Finished and Cancelled statuses, the visit is read-only.
  
-  * in the ''Draft'' status, the visit can be modified; +This mechanism ensures compliance with the visit lifecycle and prevents unauthorised modifications.
-  * in the ''Planned'' status, the information is accessible but not editable; +
-  * in the ''Finished'' and ''Cancelled'' statuses, the visit is read-only.+
  
-This mechanism ensures compliance with the defined lifecycle and prevents unauthorised modifications.+----
  
transnational_access/transnational_access/research_visits.1770972994.txt.gz · Last modified: by fincons